Woodnet Forums
Well boys, I'm in it now. Bathroom remodel steps? - Printable Version

+- Woodnet Forums (https://forums.woodnet.net)
+-- Thread: Well boys, I'm in it now. Bathroom remodel steps? (/showthread.php?tid=7323440)

Pages: 1 2 3 4


Well boys, I'm in it now. Bathroom remodel steps? - jgourlay - 10-03-2016

So....the new face frame for the bathroom cabinet has turned into "do it all".  Not stripping all the way to the studs, but doing all else.  I need to:  remove drywall texture, retexture, paint, replace vanity top, replace sink and fixtures, replace light fixtures, strip and repaint the moulding, the install the new face frame/inset doors.  Maybe a new toilet as well, don't know about that yet.

What is the smartest order in which to do the above?


RE: Well boys, I'm in it now. Bathroom remodel steps? - chips ahoy - 10-03-2016

Hire someone to do it.

Mel


RE: Well boys, I'm in it now. Bathroom remodel steps? - Wild Turkey - 10-03-2016

^^^what he said.
Laugh


RE: Well boys, I'm in it now. Bathroom remodel steps? - Admiral - 10-03-2016

Sounds like a few change orders. My bride does that to me all the time. Must be a Wimmen thing . . . .


RE: Well boys, I'm in it now. Bathroom remodel steps? - Stwood_ - 10-03-2016

Remove vanity and everything off of the walls. Remove all trim. New floor covering? Remove whats there.
Do ceiling first, then install new light fixture. Do walls....floor.....install trim, vanity


RE: Well boys, I'm in it now. Bathroom remodel steps? - Bob10 - 10-03-2016

what he said but I would take the drywall out to see what is behind the walls as I have redone stuff only to have laterals fail in the walls.  Also I would want to see if any half butt work or rot is buried in those walls.  Honestly I think tossing up new drywall would be easier than trying to strip and refinish whats in place.  Lastly pull the toilet first get it out of your way and stuff a rag in it while you are doing demo and drywall.  Once that is done you can probably slap it back in if you need it.


RE: Well boys, I'm in it now. Bathroom remodel steps? - R Clark - 10-04-2016

If I decided I was going to remove texture and then retexture, I'd just strip the drywall out and put up new.  That will also expose plumbing and electrical for inspection.  Never know what you'll find back there. 

You're going so far into this, might as well do a complete job.


RE: Well boys, I'm in it now. Bathroom remodel steps? - CLETUS - 10-04-2016

This takes project creep to a new level.


Remember, you're a "fine jewelry box" type of guy. This project will only take you a couple months... Of course, that will be after 6 months of obsessing over minor details.


RE: Well boys, I'm in it now. Bathroom remodel steps? - jgourlay - 10-04-2016

(10-03-2016, 06:59 PM)Wild Turkey Wrote: ^^^what he said.
Laugh

I would LUV to!  Problem is...she SPECIFICALLY wants me to do it.  Also, I need/want (and it is need/want not just want) a new car.  Pay for contractor = no new car.

There are few things in life I despise (and suck at) more than anything drywall.


RE: Well boys, I'm in it now. Bathroom remodel steps? - K. L. McReynolds - 10-04-2016

About three months ago, LOML said she wanted to (meaning me do it) down the wall paper in the hall bath.

Still had 1965 tile for tub surround.

End result? Down to studs, new three piece tub surround, new sheetrock, new vanity, new gloss paint, new wainscoting, new mirror, new towel bars, and refinish the door/trim. In that order. Took a week(with help). And another couple weeks(cause I procrastinated) to repair the hole in front of the new(different size) vanity.