Solar Lumber Drier - Part 2 - Printable Version +- Woodnet Forums (https://forums.woodnet.net) +-- Thread: Solar Lumber Drier - Part 2 (/showthread.php?tid=7349567) |
Solar Lumber Drier - Part 2 - jteneyck - 08-02-2019 I finished most of the framing today. I built the end walls first. I drew them out on the floor and then built them to that full size drawing. Then I found that the LP Smartside panels I wanted to use require 16" oc studs. OK, down came the end walls. Sure glad I hadn't built the whole thing before I read the fine print on LP Smartside. The front and back walls were typical rectangular walls and it all went up pretty quickly. The 2 x 10 ridge beam was surprisingly easy to put up there by myself; good planning I guess. With that in place I cut the bird's mouth on the lower ends of the front wall rafters and the straight 45 deg cuts on the top of them and set them 24" oc and screwed them in place. The rear wall rafters are set at 30 deg and extend over the back wall about a foot to give some weather protection for the vents. Just have to add the purlins between the front rafters for the acrylic glazing and then the basic framing will be done. Oh, and a couple of collar ties, too, to hold the center of the rear wall from wanting to bow out. John RE: Solar Lumber Drier - Part 2 - Hank Knight - 08-03-2019 Lookin' good, John. I'm interested in this project. Thanks for posting. RE: Solar Lumber Drier - Part 2 - Gary G™ - 08-03-2019 Looking good John .. RE: Solar Lumber Drier - Part 2 - Bill Wilson - 08-04-2019 Nice. I'll be following this thread, with interest. RE: Solar Lumber Drier - Part 2 - Ken Vick - 08-04-2019 John, Are your panels facing north in this pic or are you intending to rotate the building after the construction is finished? Just kidding. That would be the kind of mistake I would make. Ken RE: Solar Lumber Drier - Part 2 - Stwood_ - 08-04-2019 Is the plastic vapor barrier on the bottom of the floor joists going to trap moisture under the plywood? RE: Solar Lumber Drier - Part 2 - Duane N - 08-04-2019 Very nice so far. I like the side entry doors for getting the lumber in and out instead of on the North wall like I've seen some built. RE: Solar Lumber Drier - Part 2 - Stwood_ - 08-04-2019 Woodmizer used to market one. The whole front portion raised up. RE: Solar Lumber Drier - Part 2 - jteneyck - 08-05-2019 (08-04-2019, 04:00 PM)Stwood_ Wrote: Is the plastic vapor barrier on the bottom of the floor joists going to trap moisture under the plywood? That's how Wood Magazine shows it should be built. My thought process suggests this will prevent ground moisture from getting on the floor framing and plywood floor. Time will tell. John RE: Solar Lumber Drier - Part 2 - jteneyck - 08-05-2019 (08-04-2019, 04:34 PM)Duane N Wrote: Very nice so far. I like the side entry doors for getting the lumber in and out instead of on the North wall like I've seen some built. If you are fortunate enough to have a tractor, Bobcat, etc. with forks, big double doors on the North side make a lot of sense for loading the kiln with a pre-stickered pallet of wood. Since I don't I decided to go with the smaller access doors on the end walls. John |