07-29-2017, 05:43 AM
Hi there,
The project involves the 'facelifting' of an existing 12x24 structure, currently covered with painted 1/4 inch plywood.
Given the building is out of plumb by nearly an inch and to jack it up slightly is not feasible, what would be the best way to start the first 4x8 LP siding sheet?
Do I use the existing sheets the guidelines or do I cut the first sheet so that it plumb and hence the guide for the remaining sheets? My concern with the latter option is that I run the risk of missing the studs needed for nailing. A possible solution is the use of construction adhesive in conjunction with nailing along the top and bottom plate.
Thanks in advance for your input.
Cheers,
Windr
The project involves the 'facelifting' of an existing 12x24 structure, currently covered with painted 1/4 inch plywood.
Given the building is out of plumb by nearly an inch and to jack it up slightly is not feasible, what would be the best way to start the first 4x8 LP siding sheet?
Do I use the existing sheets the guidelines or do I cut the first sheet so that it plumb and hence the guide for the remaining sheets? My concern with the latter option is that I run the risk of missing the studs needed for nailing. A possible solution is the use of construction adhesive in conjunction with nailing along the top and bottom plate.
Thanks in advance for your input.
Cheers,
Windr