Is the floor concrete or wood?
Mike
If you're the smartest person in the room, you're in the wrong room!
But not today...
Posts: 40,014
Threads: 0
Joined: Apr 2007
what supports the walls? is there raised foundation of sorts?
Phydeaux said "Loving your enemy and doing good for those that hurt you does not preclude killing them if they make that necessary."
Phil Thien
women have trouble understanding Trump's MAGA theme because they had so little involvement in making America great the first time around.
Posts: 4,676
Threads: 0
Joined: Jan 2007
Not a good start to place a building but I understand life happens. How about calling a mud jacking outfit for a consultation?
Any free advice given is worth double price paid.
Posts: 31,080
Threads: 2
Joined: Mar 2003
Location: Athens, TN
Why not level the tool instead? Seems infinitely easier.
Leveling 180 sq feet of space for one tool?
Given common 2x walls, your sill plate is 1 1/2" You could over-pour a lightweight self-leveling concrete up to the top of the sill plate. I'd check with local contractors on what might be available.
Then, when done, your still gonna level up the grinder to some degree.
Rocket Science is more fun when you actually have rockets.
"The Constitution is not an instrument for the government to restrain the people, it is an instrument for the people to restrain the government." -- Patrick Henry
Posts: 725
Threads: 0
Joined: Dec 2002
I would go with the leveling the tool, or fora smaller tool a heavy duty level shelf. Lots of folks use their garage with a sloped floor for shops.
Posts: 4,444
Threads: 0
Joined: Jan 2005
Leveling the tool is one way already mentioned. If I understand you correctly the floor is 1-1/2" out of level for 24'-0".The shed is 7-0" wide.If you need the entire floor level I would install a 2x2 24'-0" on the low side perimeter.
Lay a 7-'0" straight edge square to the 2x2 and on top.Next piece can be a rip of 5/4 decking which probably measures 1'-1/16".Don't be concerned with 16" spacing.The decking thickness will determine that.Next try 3/4 or 5/8" stock. 3/8" plywood next and probably the last piece. You can use subfloor adhesive and screws to install plywood.
If the existing floor is concrete then tapcons would be a good choice for the areas that are less than 1" .
You could rip 7'-0" tapered sleepers also instead of running lumber the long way.
Put 30 lb tar paper down first if the original floor is concrete.May pay to lay out where the feet will be and make those areas solid.Easiest way to do this is to fasten cats between sleepers and then fill with sand.A concrete mix is what most people would use, if the sand is contained ,caulk the bottom of the cell, then sand is all you need.
1000 lbs evenly distributed is not anything to be concerned about.
mike
Posts: 546
Threads: 0
Joined: May 2001
The slope is on the 7" length. The highest point is next to the shop floor and slopes away from it. The entire slab is 1 1/2 inches below the shop floor and has a footing on the ends and the outside. I am moving my surface grinder (which weighs 2246 lbs) in it. I think I have decided to break out enough of the slab to get at least 2.5 inches of concrete. I remeasured and the slab has a 2" slope. I can drill holes and epoxy rebar to tie it to the shop floor and existing footings. Then the entire area will be tied out in rebar. I would like to pour a footing where the grinder will set which will require breaking it out to the footings in that area. I am also moving my bead blaster, buffers, and grinders. I am attempting to refurb all my handplanes, including new jappaning, zinc plating the lever caps where applicable, and sharpening. I am gearing up to turn my lathe into a CNC to turn knobs. I also have other uses for the grinder.
BAT