03-26-2017, 08:53 AM
10 post holes dug and posts set and concrete poured yesterday. It's the beginnings of my pool deck. The first 2 I did were through moist clay, no rocks, i didn't really need the digging bar, just the post hole digger. The next 5 were rocks, old tree roots, you name it if it was hard to dig through it was there. At least in NC a lot of the 'rocks' are some weird orange colored stuff that if you have enough determination you can bust em with a bar.