Posts: 4,444
Threads: 0
Joined: Jan 2005
(04-02-2020, 09:32 PM)pebbles Wrote: I am putting in a new kitchen in house that is almost fifty years old. The linoleum floor is in very rough shape. The house was built with on layer of floor sheeting. Underlayment was added to all the rooms except the kitchen and bathroom when new carpet was installed. I am planning on installing underlayment on the kitchen floor and then new flooring ( tile, solid or wood veneer, or engineered flooring. Before I add underlayment should I remove the old linoleum or just lay it on top? Anybody have any experience or knowledge about this subject.
If the linoleum is cracked, curled edges etc. I would remove it. If it is sound but just worn you can go over it. Use staples to attach the underlayment, less chance it crack the linoleum as nails might.
I installed 1/4" underlayment over block tiles about 10/12 years ago , no problems .
mike
Posts: 64,732
Threads: 3
Joined: Feb 2007
Location: Merryland
There's a couple reasons I'd remove the vinyl . Surprised there is no underpayment under it. If there were, I'd remove it too. It just gives me more available vertical space to work with.
Cabinets, refrigerators, microwave ovens dishwashers etc are generally built to standardized dimensions but still vary in height up to about 1/2". Also, floors and ceilings aren't always level (rarely level). Any bulkheads built around ceiling duct-work or if the existing upper cabinets are mounted against bulkheads can cause dimensional issues too. Often times the open bulkheads above upper cabinets serve as return air ducts, particularly in two or three story homes. Bulkheads aren't always accurately enough constructed to work perfectly with all the standardized dimensions of appliances and cabinets.
Assuming you have 8ft ceilings, available space gets real tight. So there's a lot to consider. I've done a few kitchens now and I've run into a couple things more than once. There's generally about 3/4" available room for flooring before the refrigerator hits whatever is above it. Installing 3/4" hardwoods can still cause the fridge to hit the cabinet or bulkhead above it. Some newer refrigerators have bulky exterior upper hinges so even if the fridge fits under the cabinet, the cabinet doors still hit the hinges and don't fully open.
Depending on if you mount your lower cabinets on the subfloor or on top of new flooring or shim them off the subfloor or your new flooring up against the cabinet basses... the dimensions all come into play. The same with the distance between your stove-top and your microwave above it (assuming there is one there). Will your dishwasher fit under the countertop if your cabinets are sitting on subfloor? Is the spot where you intend to put the dishwasher or fridge a high spot on the floor? You just want to make sure each decision you make won't screw up other decisions you make.
Even taking everything into consideration, varying ceiling height and varying floor levels easily screw everything up. Flooring over vinyl might just lose that 1/8" you needed to get the fridge under a cabinet or your dishwasher under the countertop.
Tile over a backerboard can also be about 3/4" or more thick.
The last kitchen I did, I thought I had it all worked out. Until I started sliding the refrigerator under the cabinet. About halfway back, the top of the fridge hit the upper cabinet. I had to take down the cabinet and cut about 3/8" off the bottom to get the fridge in. There was a high spot against the wall under the fridge I didn't account for. This was using 3/4" hardwood flooring and 15# felt paper under the flooring.
So, imho... take up all flooring and start from scratch, you might be glad you did.
Posts: 1,601
Threads: 0
Joined: Jan 2014
A situation we experienced makes for another reason...we installed new cork flooring over an existing linoleum floor. (I took up the flooring/underlayment I installed in the 80's leaving the linoleum that was in the house when we bought it). Apparently a mouse chewed the dishwasher discharge hose causing a leak into the DW insulation, gradually working its way to the floor (actually between the linoleum and new cork). Took several weeks/months to manifest itself, but the floor started to swell about 10 ft from the DW. The discharge effluent was trapped by the linoleum and just laid there. No leaks in the basement at all...When I lifted a piece of the cork, wow what a mess of mold and stench...$60k insurance claim later (no public adjuster needed. it was that bad).
Posts: 14,939
Threads: 0
Joined: Sep 2004
Location: Butler, PA
Wasn't linoleum made with asbestos, back in the day? Removing it may require some extra care. Not sure what you do with it, once removed.
If you are going down a river at 2 mph and your canoe loses a wheel, how much pancake mix would you need to shingle your roof?
Posts: 13,412
Threads: 0
Joined: Jun 2004
Location: Texas
Good luck removing the black tar stuff they used back then under the vinyl if it was laid down thick and breaks loose in spots and leaves a rough surface.
If you don't have that, I'd remove the vinyl.