Posts: 31,094
Threads: 2
Joined: Mar 2003
Location: Athens, TN
(10-16-2020, 06:00 AM)Dusty Workshop Wrote: I just installed a raised fire pit bed surrounded by railroad ties. One of the ties has several holes where the spikes used to be. The other day after a rain I noticed that they had filled up with water. I am thinking that to preserve the tie better it might be a good idea to fill these holes. My thought was to cut some pieces of pressure-treated and put them down into the hole up to about half inch from the top and then fill with Roofing flashing adhesive.
Any other ideas?
Thanks
Drill the holes all the way through so they drain.
Rocket Science is more fun when you actually have rockets.
"The Constitution is not an instrument for the government to restrain the people, it is an instrument for the people to restrain the government." -- Patrick Henry
Posts: 2,201
Threads: 1
Joined: Oct 2003
Stuff it with caulk backer rod, then sealant topping of your choice.
Assuming since they’ve been used that they were preserved with creosote or CCA.
Posts: 27,911
Threads: 0
Joined: Jul 2002
Location: Pacific ocean now much further away!
Turn them upside down?
VH07V
Posts: 13,412
Threads: 0
Joined: Jun 2004
Location: Texas
Metal cap?
If those catch fire, you'll never put them out.
We at the VFD have sprayed them with foam and they still smolder for days.
Posts: 24,145
Threads: 2
Joined: Sep 2003
Location: Missouri
Those ties will still be there after you croke...holes or not.
Steve
Mo.
I miss the days of using my dinghy with a girlfriend too. Zack Butler-4/18/24
The Revos apparently are designed to clamp railroad ties and pull together horrifically prepared joints
WaterlooMark 02/9/2020
Posts: 12,604
Threads: 0
Joined: Aug 2003
Location: Wapakoneta, OH
They would be home to mosquitoes if you don't do soemthing, is drilling them all the way through an option...that seems easiest.
I started with absolutely nothing. Now, thanks to years of hard work, careful planning, and perseverance, I find I still have most of it left.
Posts: 4,787
Threads: 0
Joined: Jan 2005
I like the backer rod idea. I think I will drop some gravel in first so I don't need as much backer rod. This tie is the top of a stack of 2 so I don't know if drilling through would work well.
The whole area is about 150 sq feet so the fire is not close to the ties. Shouldn't pose a fire Hazzard.
Thanks for the suggestions!
Posts: 11,704
Threads: 1
Joined: May 2014
Location: South Central Oklahoma
Put railroad spikes in the holes, they should fit, and would look too cool.
Jim in Okie
You can tell a lot about the character of a man -
By the way he treats those who can do nothing for him.