02-12-2021, 03:04 PM
I already know it's a terrible idea to work with green slabs. However, with that said I wonder if my application may be low risk.
I'm making a double live edge slab desk. the frame is a very simple metal frame with two anchor points on each cross support. If I don't finish the slab (other than sanding) and use loose anchors so there is play (or none at all if it's heavy enough) then isn't it conceivable that it will do all it's acclimating in my office for as long as is needed?
The slab would basically get a fresh cut on the ends and that's it.
I know, terrible idea right?
I'm making a double live edge slab desk. the frame is a very simple metal frame with two anchor points on each cross support. If I don't finish the slab (other than sanding) and use loose anchors so there is play (or none at all if it's heavy enough) then isn't it conceivable that it will do all it's acclimating in my office for as long as is needed?
The slab would basically get a fresh cut on the ends and that's it.
I know, terrible idea right?