I would add a single #3 rebar in the center with a 18 inch lap splice for each over lapping piece. I assume the Quickrite Crack Resistant Concrete is fiber reinforced.
Greg
Posts: 379
Threads: 0
Joined: Nov 2010
I would put a bar down the center as well and be sure to overlap and tie the bars together.
You didn't mention your location, but if it's subject to freeze/thaw and on clay then you should really consider more than 1" of stone. Frost will destroy it quickly.
The Quickcrete crack resistant is more for shrinkage cracking and as a wire mesh replacement in slabs. It will still be subject to freeze/thaw issues and frost heaving.
Of course if it's a warm climate, then please ignore.
Posts: 1,567
Threads: 0
Joined: Feb 2003
Probably not necessary but I would put the rebar in it (with laps as other poster said). I would also saw or trowel in a joint at 10' max. spacing. 10' is the spacing the DOT here specs for curb and gutter (no rebar in curb). I'd actually probably go 8' spacing or less if I were in your shoes. 40' runs it's probably going to crack so the sawed joint is to control where the crack is. You don't need to go super deep - 1/3 depth is recommended but you can go less, you're just making a failure plane that is weaker than the surrounding areas and more likely to crack there. Do the faces if you have access or at least do the top. I'd saw them in with a 4" angle grinder w/in a day of pour- i.e. as soon as you wreck the forms, or just the top at a minimum and go as deep as you can.
Posts: 39
Threads: 0
Joined: Aug 2016
Wanted to say thanks for the replies. I did put #3 rebar in the forms and made the pour with 74 50 pound bags.
Grateful for the suggestions.