09-11-2018, 05:09 PM
Ok, I've got a two zone HVAC system that I'm getting bids for replacing. Everybody looks into the panel, and says nothing. The guy today looks in the panel and says that I've got to get an electrician because the power to the two furnaces is supplied by one 20 amp circuit, and code requires two separate 15 amp circuits, one for each furnace. Systems were originally installed in 2000-2001 time period. I'm scratching my head over this one. Is he correct or a worry wart? I'm in NJ if that makes any difference. Thanks for any guidance.