Happy belated Thanksgiving all.
Looks like it's been a few months since I updated my kitchen build thread.. It's "99.9%" done at this point but still some cosmetic details. I took these pictures on Thanksgiving day right after cleaning everything up before the festivities, figured it would be a good time to take some new pix and meant to post this that day, but forgot to. (This is also by the way the first time we've entertained anybody in this new space)
Since the last update, the pocket door went in, all the windows and doors got re-trimmed with new paint. The new appliance garage for the right-hand side of the wetbar was built and went in (it came out great!)
subway tile backsplash is all in, but it's not yet grouted because we can't decide on a color!
Most of the in-drawer LEDs are wired up (but not all, have to get around to finishing them.)
You may also notice I made new doors from white oak (rather than paint grade) for the upper cabinet by the sink, and re-made the two doors over the coffee machine.. I had originally made those doors slightly different with a third rail and divider kind of making two squares, thinking a bit of variation would be nice, but LOML didn't like it, so I made new ones, and I now agree I should have just kept it simple the first time around.
So what's left is grout for the backsplash, finish the LED wiring for inside all the drawers and cabinets, trim out the gaps between the cabinets and ceiling and make a couple simple floating shelves to go between the two uppers on the wetbar. Then, it'll finally be done!