Floor has dried...ball game wasn't worth watching....headed for the shop....more fun, anyway
Clamps came off! Plywood panels fitted and installed...c clamps and cauls to keep things sitting down into the glue...
Set the base onto the floor...set the top on the base...
Hmmm, top needs a lot of work....
Center board was a tad thicker ...cambered jack to thin it down a bit...glue lines needed a touch up..
Corners needed a radius marked.
.
Cut the curve on the bandsaw, beltsander to smooth the saw marks,,,,and this vintage sander had quite a bit of work to do....router reset...
More sanding....Set the top good side down on the bench, for now...base needed slotted holes drilled
Set the base up and onto the top...centered up...at least on one edge...attached with screw and washers along that edge,,,clamp was used to pull the other edge into alignment
Two more screws and washers....centered in the slots. Allows the the top to expand or contract as it wants...found the plug cutter, made 3 plugs...with my lock, I need a spare..
Installed two plugs..
And set the assembled table onto the floor...after the Foot Pads had been installed...
Waiting on glue to cure...have two inlay pieces to cobble up, and install...once those cauls get out of the way
Then sand to 180/220 grits and add the Shellac...after that we'll see..
Just a simple table....stay tuned..