Back is installed....
Upper 3 Dividers installed, glue only..
Corner braces..which I use to attach to the top of the case..installed..
Once these clamps come off..
Screws were added..
Lower Dividers were milled and installed...glue only..
The fancy center point has a glue block behind it..with a screw as a clamp..
Needed 5 blanks for the drawer fronts..
And enough slats to glue up a panel for the Top of the case, with a bread board ends..
Both bundles are a bit thick..might get them thinned down, later....
THIS is all that is left...MAYBE 3 bft?
Stay tuned....
Out of 52 bft of Ash...
Upper 3 Dividers installed, glue only..
Corner braces..which I use to attach to the top of the case..installed..
Once these clamps come off..
Screws were added..
Lower Dividers were milled and installed...glue only..
The fancy center point has a glue block behind it..with a screw as a clamp..
Needed 5 blanks for the drawer fronts..
And enough slats to glue up a panel for the Top of the case, with a bread board ends..
Both bundles are a bit thick..might get them thinned down, later....
THIS is all that is left...MAYBE 3 bft?
Stay tuned....
Out of 52 bft of Ash...
Show me a picture, I'll build a project from that