The electrical supply line coming out of the drywall ceiling into the top of the heater isn’t in conduit.
What’s involved in removing the connection at the top of the hot water heater in order to slide conduit over the Romex?
Gary
Please don’t quote the trolls.
Liberty, Freedom and Individual Responsibility
Say what you'll do and do what you say.
Posts: 2,201
Threads: 1
Joined: Oct 2003
12-14-2019, 02:41 PM
(This post was last modified: 12-14-2019, 06:03 PM by srv52761.
Edit Reason: Changedcnduit size
)
Unscrew the cover plate, probably untwist wire nuts, unscrew the equipment ground. (Edit: probably an untwist also, not an unscrew - all pretty simple).
Assuming 240v, #10 10-2wg.
If so, you would need 3/4” flexible probably??
If it is 10-3wg then I think you’ll need to go to a1” conduit.
(@53% fill... if I read it correctly, someone else could correct me).
Edit: if you want a more reasonable conduit size, 1/2”, consider adding a junction box at the ceiling and transitioning to thhn
Posts: 22,709
Threads: 0
Joined: Feb 2005
Location: Regina Saskatchewan Canada
Why?
........................17.................
Blackhat
Bad experiences come from poor decisions. So do good stories.
Posts: 13,412
Threads: 0
Joined: Jun 2004
Location: Texas
No one here uses conduit.
But then again, no one ever uses a stress connector either.
Posts: 1,996
Threads: 1
Joined: Aug 2016
(12-14-2019, 11:33 PM)daddo Wrote: No one here uses conduit.
But then again, no one ever uses a stress connector either.
Must be a local code as they want it here also. They are normally open at the top, conduit box connector on top of WH . Just a sleeve for protection ? Roly