11-29-2022, 09:01 AM
I hope you all had a wonderful Thanksgiving!
Quick progress update - the quartz is in!
Really taking shape and feels like a kitchen now. The new sinks, gas range, dishwasher and beverage cooler are in place and up and running. I have the bracket mounted for the vent hood (and corresponding receptacle wired) with perfect access to it from upstairs in the back corner of a large bedroom closet, should be easy enough to bring a duct straight up about 6' and a quick 90* to direct it out the side of the house (I have a tin-knocker buddy whose going to do that for me) then I'll just box it in up in the closet.
I've made a total of 19 drawer boxes, all hand-cut dovetails on all 4 corners (which was an oddly satisfying process even tough it took me probably 24 hours in total over a couple weeks) and there are a few more to do. I'm thinking maybe for a finish on the drawer boxes just a quick spray coat of shellac?
I've only started positioning boxes along the "appliance wall" (fridge/double wall oven/microwave and pantry) as the quartz wasn't dependent on that timing.
Still have to wire up all the magnetic switches and such for the LED lighting inside the cabinetry. The drawer boxes are all just dry-fit and placed in their openings at this point, none are yet functional. The rails/stiles/panels for the doors and drawer false fronts were all made last winter, still need to do final sizing, assembly and finishing and then get to work on the woodworking for the island base (those small horizontal pieces of plywood covering the gap between the island bases is to keep my 5lb ancient and blind dog from walking between them, as there's a large hole cut in the floor between them into a cold air return which he of course fell into!)
Speakers are installed in the ceiling and already being used and I've got some pendant lights to layout now and cut in over the island (I have a scaffold platform I'll stand on, I'm afraid of walking around on the island top).. Trim work still around the doors/windows, will probably come last, and of course the whole wall behind the sink around the window is going to get a subway tile of some sort. Lots to do but the end is in sight!
Quick progress update - the quartz is in!
Really taking shape and feels like a kitchen now. The new sinks, gas range, dishwasher and beverage cooler are in place and up and running. I have the bracket mounted for the vent hood (and corresponding receptacle wired) with perfect access to it from upstairs in the back corner of a large bedroom closet, should be easy enough to bring a duct straight up about 6' and a quick 90* to direct it out the side of the house (I have a tin-knocker buddy whose going to do that for me) then I'll just box it in up in the closet.
I've made a total of 19 drawer boxes, all hand-cut dovetails on all 4 corners (which was an oddly satisfying process even tough it took me probably 24 hours in total over a couple weeks) and there are a few more to do. I'm thinking maybe for a finish on the drawer boxes just a quick spray coat of shellac?
I've only started positioning boxes along the "appliance wall" (fridge/double wall oven/microwave and pantry) as the quartz wasn't dependent on that timing.
Still have to wire up all the magnetic switches and such for the LED lighting inside the cabinetry. The drawer boxes are all just dry-fit and placed in their openings at this point, none are yet functional. The rails/stiles/panels for the doors and drawer false fronts were all made last winter, still need to do final sizing, assembly and finishing and then get to work on the woodworking for the island base (those small horizontal pieces of plywood covering the gap between the island bases is to keep my 5lb ancient and blind dog from walking between them, as there's a large hole cut in the floor between them into a cold air return which he of course fell into!)
Speakers are installed in the ceiling and already being used and I've got some pendant lights to layout now and cut in over the island (I have a scaffold platform I'll stand on, I'm afraid of walking around on the island top).. Trim work still around the doors/windows, will probably come last, and of course the whole wall behind the sink around the window is going to get a subway tile of some sort. Lots to do but the end is in sight!