04-21-2022, 01:24 PM
I thought I had already posted this, but apparently not. If it does show up twice, forgive me.
I built mys garage in 1991. The lay of my land slopes. I have a walk out basement in my house. I had to have 8' walls poured to set the garage on. Rather than just fill it with sand, I decided to put pre-cast concrete slabs on top, and have a basement in the garage. The garage floor was then poured on top of the pre-cast slabs. There is also a concrete floor in the basement of my garage. The ceiling in the basement is the underside of the pre-cast slabs. Ceiling height is about 7 1/2'. I have a special order 7' wide double door in the basement, so I could store my boat in the winter. I am getting a quote for a new garage. Same size, 24 X 26. It may or may not happen depending on the cost. Again, I will have to have 8' poured walls as a foundation. My wife still has the paper work from the 1991 build. The pre-cast slabs at the time cost $2980. That is delivered and set on the foundation. I called the same place in S. Beloit IL., to see what the same thing would cost today. Slabs for a 24 X 26 garage, delivered, and set on the foundation. Are you sitting down? The same thing today is $15.600. Needless to say, if I do build a new garage, it won't have a basement.
I built mys garage in 1991. The lay of my land slopes. I have a walk out basement in my house. I had to have 8' walls poured to set the garage on. Rather than just fill it with sand, I decided to put pre-cast concrete slabs on top, and have a basement in the garage. The garage floor was then poured on top of the pre-cast slabs. There is also a concrete floor in the basement of my garage. The ceiling in the basement is the underside of the pre-cast slabs. Ceiling height is about 7 1/2'. I have a special order 7' wide double door in the basement, so I could store my boat in the winter. I am getting a quote for a new garage. Same size, 24 X 26. It may or may not happen depending on the cost. Again, I will have to have 8' poured walls as a foundation. My wife still has the paper work from the 1991 build. The pre-cast slabs at the time cost $2980. That is delivered and set on the foundation. I called the same place in S. Beloit IL., to see what the same thing would cost today. Slabs for a 24 X 26 garage, delivered, and set on the foundation. Are you sitting down? The same thing today is $15.600. Needless to say, if I do build a new garage, it won't have a basement.
Sometimes it's better to keep your mouth shut, and have the world think you a fool, than to speak and remove all doubt.