I am going to lay some sod (1600 sq feet of Kikuyu grass) and plan to added about 2" of sandy loam soil and then about 1" of a mix of top soil, redwood and fir shaving and kelloggs' nitro mulch to area that will be sodded to raise it a little higher.
Questions:
(1) Should I till the shady loam soil into the existing soil;
(2) Should the top mix be tilled or just left on top
(3) Should I roll any of this prior to laying the sod?
Thanks for any suggestions.
Posts: 347
Threads: 88
Joined: Feb 2005
1& 2, yes. Do not roll. Water daily until roots take hold.
Posts: 1,566
Threads: 0
Joined: Feb 2003
(06-04-2022, 03:48 AM)Gibbcutter Wrote: 1& 2, yes. Do not roll. Water daily until roots take hold.
I agree. Watering schedule I would use if it was me- every day 1st week, every other day 2nd week, 2 or 3x 3rd week, once a week after that until it is established, which it should be in a month. Adjust as weather/ etc. dictate.
Posts: 769
Threads: 0
Joined: Jan 2007
Location: ATL
First thing you should do is take some soil samples and have them analyzed. Compare the pH levels to the kikuyu requirements.
If your soil is heavily compacted, tilling before adding the loam and topsoil is a good idea.
Posts: 12,197
Threads: 2
Joined: Nov 1999
Location: Nebraska City
(05-29-2022, 11:02 AM)dwg Wrote: I am going to lay some sod (1600 sq feet of Kikuyu grass) and plan to added about 2" of sandy loam soil and then about 1" of a mix of top soil, redwood and fir shaving and kelloggs' nitro mulch to area that will be sodded to raise it a little higher.
Questions:
(1) Should I till the shady loam soil into the existing soil;
(2) Should the top mix be tilled or just left on top
(3) Should I roll any of this prior to laying the sod?
Thanks for any suggestions.
My 'preparation' this spring was to find somebody else to do it.
I did a smallish area myself last year. Poorly. Never again. That area and the rest of the yard was done again in early April. Landscape guy has the truck to haul the sod, the equipment to till/level, the roller, and the helper. All I had to do was pour the water on. Which I did according to his instructions, which was to keep it SOAKED for about 10 days, then a little bit less SOAKED the next 10 days, then soaked more than I thought it needed for a week or so after that. It's beautiful.
Posts: 15,445
Threads: 0
Joined: Feb 2002
Location: Northeastern MA
(06-07-2022, 05:31 AM)KC Wrote: My 'preparation' this spring was to find somebody else to do it.
I did a smallish area myself last year. Poorly. Never again. That area and the rest of the yard was done again in early April. Landscape guy has the truck to haul the sod, the equipment to till/level, the roller, and the helper. All I had to do was pour the water on. Which I did according to his instructions, which was to keep it SOAKED for about 10 days, then a little bit less SOAKED the next 10 days, then soaked more than I thought it needed for a week or so after that. It's beautiful.
This.
Dry sod is dead sod.
You are frequently puzzled by things you tell us you fully understand. - Bob10 to EH 9/22/16