Needed 4 of them....1/8" deep, by 1/4" wide....had to lay out WHERE they were going,too..
Divider steps out equal spaces...then trace around the shelves...then knife a few lines..
Then a wide(1") chisel to deepen the knife lines a bit...then a 1/4" chisel to remove most of the waste...repeat until close to the depth..
As set by this router plane...then, use it to level the bottom of the dado..
until it doesn't cut anymore....test the fit..
One done, only 3 more to go...
And a full dry fit....takes longer to write this up, than the do one dado...
Want to try?
Divider steps out equal spaces...then trace around the shelves...then knife a few lines..
Then a wide(1") chisel to deepen the knife lines a bit...then a 1/4" chisel to remove most of the waste...repeat until close to the depth..
As set by this router plane...then, use it to level the bottom of the dado..
until it doesn't cut anymore....test the fit..
One done, only 3 more to go...
And a full dry fit....takes longer to write this up, than the do one dado...
Want to try?
Show me a picture, I'll build a project from that