04-29-2020, 08:40 AM
Extra clamps?
After the clamps came off..
With the plywood back installed, with glue and nails,,,
My, my..such an angry face
Added a 1 x 1 bar to the bottom, to get a proper lean-back..
Old til was emptied, and removed....and a new landing pad was installed for the new saw til...
Then move the new til to this spot, and load it up...
14 saws. Finished? Only halfway there...have a door to build, hang and latch.....then maybe some of the Witch's Brew?
Have three 1 x 4 x 6' boards to haul to the shop, today....there is a plywood panel waiting on them.
As for that Mitre Box?
A Stanley No. 346 model, with it's own saw. use it for small moldings and such...
Stay tuned....door building 101 later today


After the clamps came off..


With the plywood back installed, with glue and nails,,,


My, my..such an angry face

Old til was emptied, and removed....and a new landing pad was installed for the new saw til...


Then move the new til to this spot, and load it up...


14 saws. Finished? Only halfway there...have a door to build, hang and latch.....then maybe some of the Witch's Brew?
Have three 1 x 4 x 6' boards to haul to the shop, today....there is a plywood panel waiting on them.
As for that Mitre Box?

A Stanley No. 346 model, with it's own saw. use it for small moldings and such...
Stay tuned....door building 101 later today

Show me a picture, I'll build a project from that